I am re-powering my battery banks.
Here is a photo of the before, 'after.' After the old batteries were removed. In addition to new batteries, I'm installing a new Inverter / Battery Charger, and installing a new Battery Monitor. There was lots of re-wiring and work in the Panel. New Fuses and switches.
It's not quite finished, but the batteries are installed and the Inverter is working.
(note: the batteries are 4D size. AGM 120lbs)
(note: the batteries are 4D size. AGM 120lbs)