Saturday, July 11, 2015

Boat Work Now

I am re-powering my battery banks.  
Here is a photo of the before, 'after.'  After the old batteries were removed.  In addition to new batteries, I'm installing a new Inverter / Battery Charger, and installing a new Battery Monitor.  There was lots of re-wiring and work in the Panel.  New Fuses and switches.



It's not quite finished, but the batteries are installed and the Inverter is working.  
(note: the batteries are 4D size.  AGM 120lbs)
GPL-4D L




No comments: